{"id":2447,"date":"2015-03-17T13:51:23","date_gmt":"2015-03-17T13:51:23","guid":{"rendered":"http:\/\/sasakurame.com\/?page_id=2447"},"modified":"2025-10-19T19:19:26","modified_gmt":"2025-10-19T16:19:26","slug":"sec-rabigh-desal-rehabilitation-project","status":"publish","type":"page","link":"https:\/\/sasakurame.com\/?page_id=2447","title":{"rendered":"SEC Rabigh Desal Rehabilitation Project"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2448\" src=\"http:\/\/sasakurame.com\/wp-content\/uploads\/2015\/03\/SEC-Rabigh-Plant.jpg\" alt=\"\" width=\"910\" height=\"412\" srcset=\"https:\/\/sasakurame.com\/wp-content\/uploads\/2015\/03\/SEC-Rabigh-Plant.jpg 910w, https:\/\/sasakurame.com\/wp-content\/uploads\/2015\/03\/SEC-Rabigh-Plant-300x136.jpg 300w\" sizes=\"auto, (max-width: 910px) 100vw, 910px\" \/><\/p>\n<p><span style=\"color: #000000;\"><strong>Owner:<\/strong> Saudi Electric Company<\/span><br \/>\n<span style=\"color: #000000;\"> <strong>Location:<\/strong> Rabigh<\/span><br \/>\n<span style=\"color: #000000;\"> <strong>Duration:<\/strong> December 2009 to July 2010<\/span><br \/>\n<span style=\"color: #000000;\"> <strong>Contract Value:<\/strong> 18.5 Million Saudi Riyals<\/span><\/p>\n<h4><span style=\"color: #000000;\">Scope of Work:<\/span><\/h4>\n<p><span style=\"color: #000000;\">Rehabilitation of Two (2) MSF Desalination Units (1 &amp; 2) at RABIGH Power Plant SEC. Unit capacity 4,350M\u00b3\/Day.<\/span><\/p>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"color: #000000;\">Engineering and Design: Anti Scale Injection System, Ball Cleaning System, Corrosion Monitoring System, Slope from roof plates to eliminate accumulation of water and install drain system.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"color: #000000;\">Materials \/ Equipment (as per the contract)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"color: #000000;\">Installation: Installation of Thermal Insulation, Cladding Materials, Steel Plates, Angular bars, Steel Structures, Stage partition Plates, Sight Glasses, Flange, SS 316 L brine blow down lines, Drain Pipes &amp; funnels, inlet and outlet pipes to ejector condenser for Rehabilitation of Desalination Plant No. 1 &amp; 2. Replacement of 1100 Tubes for Stage I and II. Installation of Housing \/Shades for field instruments, Junction Boxes, Instrument Piping, Isolating Valves, Power and Signal Cables and Conduits. Installation of Corrosion monitoring System, Ball Cleaning System and Anti-Scale Injection System.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"color: #000000;\">Testing and Commissioning: Testing &amp; commissioning of Desalination Plant No. 1 &amp; 2 (including Ball Cleaning System, Anti Scale Injection system, Corrosion Monitoring system) with an output capacity of 4,350 cubic meter per day (each unit) and quality of water as per AWWA standards.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"color: #000000;\">Operational Spare Parts (as per the contract)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"color: #000000;\">Special Tools and Test Equipment (as per the contract)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"color: #000000;\">Training of Company Personnel: On job training of Operation &amp; Maintenance personnel of SEC by Sasakura Middle East Company Specialists for the duration of four weeks.<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p><strong>Owner:<\/strong> Saudi Electric Company<br \/>\n <strong>Location:<\/strong> Rabigh<br \/>\n <strong>Duration:<\/strong> December 2009 to July 2010<br \/>\n <strong>Contract Value:<\/strong> 18.5 Million Saudi Riyals<br \/>\nScope of Work:<br \/>\nRehabilitation of Two (2) MSF Desalination Units (1 &amp; 2) at RABIGH Power Plant SEC. Unit capacity 4,350M\u00b3\/Day.<\/p>\n<p> \tEngineering and Design: Anti Scale Injection System, Ball Cleaning System, Corrosion Monitoring System, Slope from roof plates to eliminate accumulation of water and\u00a0[&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":2490,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-2447","page","type-page","status-publish","hentry","post-1","odd"],"_links":{"self":[{"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/pages\/2447","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sasakurame.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2447"}],"version-history":[{"count":4,"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/pages\/2447\/revisions"}],"predecessor-version":[{"id":3056,"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/pages\/2447\/revisions\/3056"}],"up":[{"embeddable":true,"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/pages\/2490"}],"wp:attachment":[{"href":"https:\/\/sasakurame.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2447"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}