{"id":2536,"date":"2015-03-28T15:50:13","date_gmt":"2015-03-28T15:50:13","guid":{"rendered":"http:\/\/sasakurame.com\/?page_id=2536"},"modified":"2025-10-19T19:37:36","modified_gmt":"2025-10-19T16:37:36","slug":"jubail-c4-rehabilitation-project","status":"publish","type":"page","link":"https:\/\/sasakurame.com\/?page_id=2536","title":{"rendered":"Jubail C4 Rehabilitation Project"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-2567\" src=\"http:\/\/sasakurame.com\/wp-content\/uploads\/2015\/04\/Jubail-C4-Rehabilitation-Project.jpg\" alt=\"\" width=\"910\" height=\"412\" srcset=\"https:\/\/sasakurame.com\/wp-content\/uploads\/2015\/04\/Jubail-C4-Rehabilitation-Project.jpg 910w, https:\/\/sasakurame.com\/wp-content\/uploads\/2015\/04\/Jubail-C4-Rehabilitation-Project-300x136.jpg 300w\" sizes=\"auto, (max-width: 910px) 100vw, 910px\" \/><\/p>\n<p><span style=\"color: #000000;\"><strong>Owner:<\/strong> Saline Water Conversion Corporation<\/span><br \/>\n<span style=\"color: #000000;\"> <strong>Location:<\/strong> Al-Jubail<\/span><br \/>\n<span style=\"color: #000000;\"> <strong>Duration:<\/strong> 4th December 2014 \u2013 6th July 2017<\/span><br \/>\n<span style=\"color: #000000;\"> <strong>Contract Value:<\/strong> 142 Million Saudi Riyals<\/span><\/p>\n<h4><span style=\"color: #000000;\">Scope of Work:<\/span><\/h4>\n<p style=\"text-align: justify;\"><span style=\"color: #000000;\">Procuring, Installing, Rehabilitating all structural components, insulation, reliability, performance testing, provisional handover and mechanical maintenance period of Al-Jubail 1st stage condenser for Units 21 to 30.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000000;\">Engineering, Study, Redesign and Modify of Evaporator venting system from stages (1-2). To conduct Eddy Current Testing of complete tubes in Stages 3-9 (including cleaning\/flushing).<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p><strong>Owner:<\/strong> Saline Water Conversion Corporation<br \/>\n <strong>Location:<\/strong> Al-Jubail<br \/>\n <strong>Duration:<\/strong> 4th December 2014 \u2013 6th July 2017<br \/>\n <strong>Contract Value:<\/strong> 142 Million Saudi Riyals<br \/>\nScope of Work:<br \/>\nProcuring, Installing, Rehabilitating all structural components, insulation, reliability, performance testing, provisional handover and mechanical maintenance period of Al-Jubail 1st stage condenser for Units 21 to 30.<br \/>\nEngineering, Study, Redesign and Modify of Evaporator venting system from stages (1-2). To\u00a0[&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":2490,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"footnotes":""},"class_list":["post-2536","page","type-page","status-publish","hentry","post-1","odd"],"_links":{"self":[{"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/pages\/2536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sasakurame.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2536"}],"version-history":[{"count":9,"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/pages\/2536\/revisions"}],"predecessor-version":[{"id":3063,"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/pages\/2536\/revisions\/3063"}],"up":[{"embeddable":true,"href":"https:\/\/sasakurame.com\/index.php?rest_route=\/wp\/v2\/pages\/2490"}],"wp:attachment":[{"href":"https:\/\/sasakurame.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}