Notice: Use of undefined constant WPLANG - assumed 'WPLANG' in /home4/acwapowr/public_html/wp-content/plugins/LayerSlider/classes/class.km.autoupdate.v3.php on line 74

Strict Standards: Declaration of Related_Sub_Items_Walker::start_lvl() should be compatible with Walker_Nav_Menu::start_lvl(&$output, $depth = 0, $args = Array) in /home4/acwapowr/public_html/wp-content/plugins/advanced-menu-widget/advanced-menu-widget.php on line 0

Strict Standards: Declaration of Related_Sub_Items_Walker::end_lvl() should be compatible with Walker_Nav_Menu::end_lvl(&$output, $depth = 0, $args = Array) in /home4/acwapowr/public_html/wp-content/plugins/advanced-menu-widget/advanced-menu-widget.php on line 0

Strict Standards: Declaration of Related_Sub_Items_Walker::start_el() should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home4/acwapowr/public_html/wp-content/plugins/advanced-menu-widget/advanced-menu-widget.php on line 0

Strict Standards: Declaration of Related_Sub_Items_Walker::end_el() should be compatible with Walker_Nav_Menu::end_el(&$output, $item, $depth = 0, $args = Array) in /home4/acwapowr/public_html/wp-content/plugins/advanced-menu-widget/advanced-menu-widget.php on line 0
Al-Wajh Plant - Sasakura Middle East Company

Al-Wajh Plant

Al-Wajh-Plant-1
Al-Wajh-Plant-2

 

Owner: Saline Water Conversion Corporation

Location: Al-Wajh, Ummlujj, Rabigh, Al-Lith, Qunfuda, Farasan.

Duration: February 2006 to November 2009

Contract Value: 874 Million Saudi Riyals

Scope of Work:

Engineering, Material and Equipment Procurement, Fabrication, Erection and Installation, Testing and Commissioning of all equipment and structures in terms of Turn-key contract. To construct desalination plants at six different locations at the same time in Al-Wajh, Ummlujj, Al-Lith, Qunfuda and Farasan, these plants would supply additional 9,000 cubic meters of potable water each daily, except the new Rabigh plant would supply 18,000 cubic meters of potable water daily.

  • Sea Water Intake System.
  • 2 x 4,500 m3/day MED Units and its accessories.
  • 2 Boilers and its accessories.
  • Product Water Potablization System.
  • Product Water Surge Protection & Transfer System.
  • Product Water Tanks (2 x 4,500)m3.
  • Diesel Tanks (2 x 1,500)m3 Equipped with Deluge Fire Protection System.
  • Electrical Transformers and Switchgears Equipped with Deluge Fire Protection System.
  • DCS and Instrument Air System.
  • In-Plant Communication System.
  • Construction of Buildings for Offices, Control Rooms, Stores & Workshops.
  • Fire Fighting System.
  • Blowdown Piping System.