Notice: Use of undefined constant WPLANG - assumed 'WPLANG' in /home4/acwapowr/public_html/wp-content/plugins/LayerSlider/classes/class.km.autoupdate.v3.php on line 74

Strict Standards: Declaration of Related_Sub_Items_Walker::start_lvl() should be compatible with Walker_Nav_Menu::start_lvl(&$output, $depth = 0, $args = Array) in /home4/acwapowr/public_html/wp-content/plugins/advanced-menu-widget/advanced-menu-widget.php on line 0

Strict Standards: Declaration of Related_Sub_Items_Walker::end_lvl() should be compatible with Walker_Nav_Menu::end_lvl(&$output, $depth = 0, $args = Array) in /home4/acwapowr/public_html/wp-content/plugins/advanced-menu-widget/advanced-menu-widget.php on line 0

Strict Standards: Declaration of Related_Sub_Items_Walker::start_el() should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home4/acwapowr/public_html/wp-content/plugins/advanced-menu-widget/advanced-menu-widget.php on line 0

Strict Standards: Declaration of Related_Sub_Items_Walker::end_el() should be compatible with Walker_Nav_Menu::end_el(&$output, $item, $depth = 0, $args = Array) in /home4/acwapowr/public_html/wp-content/plugins/advanced-menu-widget/advanced-menu-widget.php on line 0
Jubail C4 Rehabilitation Project - Sasakura Middle East Company

Jubail C4 Rehabilitation Project

 

Jubail-C4-Rehabilitation-Project

 

Owner: Saline Water Conversion Corporation
Location: Al-Jubail
Duration: 4th December 2014 – 6th July 2017
Contract Value: 142 Million Saudi Riyals

Scope of Work:

Procuring, Installing, Rehabilitating all structural components, insulation, reliability, performance testing, provisional handover and mechanical maintenance period of Al-Jubail 1st stage condenser for Units 21 to 30.

Engineering, Study, Redesign and Modify of Evaporator venting system from stages (1-2). To conduct Eddy Current Testing of complete tubes in Stages 3-9 (including cleaning/flushing).